国产视频久久久久久免费,国产精品日韩欧美亚洲另类,巜交换邻居女朋友9,成人深夜日本一区二区无

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: www.sla1688.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
艳阳门无删照片1400还有视频| 无码人妻一区二区三区色欲av| 巜温泉欺辱人妻动漫在线| 国产偷抇久久一级精品a| 国产精品色情国产三级在| 亚洲日本欧美日韩一区二区| 亚洲精品美女久久久久99| 大尺度做爰无遮挡动漫| 青娱乐AV在线| 久久6热视频免费一级片| 五月丁香激激情亚洲综合| 一二三四社区在线高清3| 香港a片| 国产一级二级三级在线观看| 久久久久久久久久免费剧| 老旺的大肉蟒进进出出| 欧美线在线精品观看视频| 亚洲人成777在线播放| 国产超短裙丝袜在线观看| 三级片视频一区| 国产国语老龄妇女a片| 大学生第一次破女处a片| 欧美性白人极品在线观看| 日韩电影神马影视一区二区 | 少妇的诱惑在线免费观看| 国产丰满乱子伦无码专区| 黄色av电影在线免费观看| 色婷婷av视频一二三区小说 | 强开美妇后菊哀嚎哭叫视频| 亚洲精品一区二区三区国产| 狠狠色综合?久久久尤物| 天干天干天夜夜爽啪啪免费网站| 国产精品三级欧美三级二区| 中文字幕热久久久久久久| 欧美成人在线aaa电影| 国产在线观看XXXXX| 久久av动态图一区二区| 国产麻豆精品一区一区三区| 精品国产乱码久久久软件| 伊人中文字幕亚洲精品乱码| 肥臀精品国产一区二区三区|